
specialize in electrical power transmission items,pto shaft, agricultural gearboxes , CATV products, mechanical seal, hydraulic and Pheumatic, and promotional items.
|
Materials |
1. metal:Aluminum/Metal/Alloy metal/Stainless metal/Brass,copper,bronze etc. two. plastic: Stomach muscles,POM,PE,PP,PVC,Personal computer,PMMA,Teflon,nylon and so forth. 3. others: carbon fiber, glass,fiberglass, wood, hard rubber and so forth. |
|
Colour |
Silver, Grey, Black ,Gold or as client’s need |
|
Floor Roughness |
Ra0.8 ( without sharpening or grinding) |
|
Symbol Method |
laser engraving, CNC engraving, display screen-printing and so forth. |
|
Area Finish |
Anodize sharpening zinc/nickel/chrome/gold plating, sand blasting, ect. |
|
Tolerance |
+/- .01–.05mm / can also be custom-made |
|
Certification |
ISO SEPG |
|
Processing equipments |
CNC machining middle,NC lathe, Grinding equipment, Computerized lathe equipment, Traditional lathe device,Milling device,Drilling equipment,EDM,Wire-reducing device,CNC bending device etc |
|
Tests equipment |
Coordinate measuring device,Image measuring instrument,Caliper and many others |
|
Application |
Health care Instruments/Digital/ Industrial// Automation / motorcycle/3D printer |
|
Service |
OEM,ODM or as client’s necessity |
Packaging & Delivery
Packaging Particulars
1. interior packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and many others.
two. outer packaging: carton box, wood circumstance, plate and many others.
3. as for every customers’ requirement
Port
xiamen, or as client’s prerequisite
Guide Time :
| Amount(Items) | 1 – 20 | 21 – 100 | one hundred and one – 1000 | >1000 |
| Est. Time(days) | 5 | 10 | twenty five | To be negotiated |
| Trade Terms | FOB, CIF, EXW |
| MOQ | 1Pcs |
| Port | xiamen, or as client’s requirement |
| Transport | By air (DHL,UPS,Fedex,EMS and so forth.),By Sea,Categorical… |
| Payment Technique | T/T(financial institution transfer),L/C,paypal,western union, moneygram,escrow, cash etc |
| Payment Phrases | fifty% ahead of production, fifty% ahead of delivery |
| Packing | interior box,many packing containers/master carton or as customer’s necessity |
| Shipping time | 5-7days for Alanple time,five-25 days for production |