
Our AdvantagesProducts Massive volume in Inventory, No MOQ needed We comply with all the international standards, such as ISO9001 and TS16949 specifications.
|
Components |
one. metal:Aluminum/Steel/AOur manufacturing unit has attained the certificate of China’s Farm Machinery Products Quality Authentication promulgated by the Farm Machinery Merchandise Top quality Authentication Centre of China. lloy steel/Stainless metal/Brass,copper,bronze and so forth. two. plastic: Abdominal muscles,POM,PE,PP,PVC,Personal computer,PMMA,Teflon,nylon etc. three. other folks: carbon fiber, glass,fiberglass, wood, challenging rubber and so on. |
|
Coloration |
Silver, Grey, Black ,Gold or as client’s requirement |
|
Surface area Roughness |
Ra0.eight ( without sprucing or grinding) |
|
Brand Method |
laser engraving, CNC engraving, display-printing and so on. |
|
Floor Finish |
Anodize polishing zinc/nickel/chrome/gold plating, sand blasting, ect. |
|
Tolerance |
+/- .01–.05mm / can also be tailored |
|
Certificate |
ISO SEPG |
|
Processing equipments |
CNC machining center,NC lathe, Grinding device, Automated lathe equipment, Conventional lathe equipment,Milling machine,Drilling equipment,EDM,Wire-reducing device,CNC bending device and many others |
|
Testing device |
Coordinate measuring equipment,Graphic measuring instrument,Caliper etc |
|
Software |
Health-related Instruments/Electronic/ Industrial// Automation / motorcycle/3D printer |
|
Provider |
OEM,ODM or as client’s requirement |
Packaging & Delivery
Packaging Particulars
one. interior packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag etc.
2. outer packaging: carton box, wood situation, plate and so forth.
three. as per customers’ prerequisite
Port
xiamen, or as client’s prerequisite
Direct Time :
| Quantity(Items) | 1 – 20 | 21 – 100 | one hundred and one – 1000 | >1000 |
| Est. Time(days) | five | 10 | twenty five | To be negotiated |
| Trade Conditions | FOB, CIF, EXW |
| MOQ | 1Pcs |
| Port | xiamen, or as client’s requirement |
| Transport | By air (DHL,UPS,Fedex,EMS and many others.),By Sea,Express… |
| Payment Technique | T/T(lender transfer),L/C,paypal,western union, moneygram,escrow, funds and many others |
| Payment Conditions | 50% just before generation, 50% prior to delivery |
| Packing | inner box,a lot of boxes/grasp carton or as customer’s need |
| Supply time | 5-7days for Alanple time,5-25 times for manufacturing |