
EPG will often adhere to it organization spirit of currently being sensible, progressive, successful and superb to make the best international transmission generate.
|
Resources |
1. metal:Aluminum/Metal/Alloy metal/Stainless steel/Brass,copper,bronze and so forth. 2. plastic: Abs,POM,PE,PP,PVC,Pc,PMMA,Teflon,nylon and so forth. three. other folks: carbon fiber, glass,fiberglass, wood, difficult rubber and so on. |
|
Colour |
Silver, Gray, Black ,Gold or as client’s need |
|
Floor Roughness |
Ra0.eight ( without sharpening or grinding) |
|
Symbol Strategy |
laser engraving, CNC engraving, display-printing and many others. |
|
Floor Finish |
Anodize sprucing zinc/nickel/chrome/gold plating, sand blasting, ect. |
|
Tolerance |
+/- .01–.05mm / can also be custom-made |
|
Certificate |
ISO SEPG |
|
Processing equipments |
CNC machining middle,NC lathe, Grinding device, Automatic lathe equipment, Traditional lathe device,Milling equipment,Drilling machine,EDM,Wire-chopping equipment,CNC bending equipment and many others |
|
Tests machine |
Coordinate measuring equipment,Image measuring instrument,Caliper and so forth |
|
Application |
Health care Devices/Digital/ Industrial// Automation / motorcycle/3D printer |
|
Provider |
OEM,ODM or as client’s need |
Packaging & Delivery
Packaging Specifics
one. internal packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and so forth.
two. outer packaging: carton box, picket circumstance, plate and so on.
three. as for every customers’ requirement
Port
xiamen, or as client’s necessity
Lead Time :
| Quantity(Parts) | one – 20 | 21 – 100 | 101 – 1000 | >1000 |
| Est. Time(days) | 5 | ten | twenty five | To be negotiated |
| Trade Terms | FOB, CIF, EXW |
| MOQ | 1Pcs |
| Port | xiamen, or as client’s prerequisite |
| Delivery | By air (DHL,UPS,Fedex,EMS and so forth.),By Sea,Express… |
| Payment Strategy | T/T(bank transfer),L/C,paypal,western union, moneygram,escrow, cash and so on |
| Payment Conditions | 50% just before production, fifty% prior to shipping and delivery |
| Packing | internal box,several bins/grasp carton or as customer’s necessity |
| Shipping and delivery time | 5-7days for Alanple time,5-25 times for creation |