China made in china Supplier Powder Coating High Precision Aluminum Alloy 6061turning Machining CNC Parts

China  made in china Supplier Powder Coating High Precision Aluminum Alloy 6061turning Machining CNC Parts

EPG will often adhere to it organization spirit of currently being sensible, progressive, successful and superb to make the best international transmission generate.

Resources

1. metal:Aluminum/Metal/Alloy metal/Stainless steel/Brass,copper,bronze and so forth.

2. plastic: Abs,POM,PE,PP,PVC,Pc,PMMA,Teflon,nylon and so forth.

three. other folks: carbon fiber, glass,fiberglass, wood, difficult rubber and so on.

Colour

Silver, Gray, Black ,Gold or as client’s need

Floor Roughness

Ra0.eight ( without sharpening or grinding)

Symbol Strategy

laser engraving, CNC engraving, display-printing and many others.

Floor Finish 

Anodize sprucing zinc/nickel/chrome/gold plating, sand blasting, ect.

Tolerance 

+/- .01–.05mm / can also be custom-made

Certificate

ISO SEPG

Processing equipments

CNC machining middle,NC lathe, Grinding device, Automatic lathe equipment, Traditional lathe device,Milling equipment,Drilling machine,EDM,Wire-chopping equipment,CNC bending equipment and many others

Tests machine

Coordinate measuring equipment,Image measuring instrument,Caliper and so forth

Application

Health care Devices/Digital/ Industrial// Automation / motorcycle/3D printer

Provider

OEM,ODM or as client’s need

Packaging & Delivery
Packaging Specifics
one. internal packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and so forth. 
two. outer packaging: carton box, picket circumstance, plate and so on. 
three. as for every customers’ requirement
Port
xiamen, or as client’s necessity
Lead Time :

Quantity(Parts) one – 20 21 – 100 101 – 1000 >1000
Est. Time(days) 5 ten twenty five To be negotiated

 

Trade Terms FOB, CIF, EXW
MOQ 1Pcs
Port xiamen, or as client’s prerequisite
Delivery By air  (DHL,UPS,Fedex,EMS and so forth.),By Sea,Express…
Payment Strategy T/T(bank transfer),L/C,paypal,western union, moneygram,escrow, cash and so on
Payment Conditions 50% just before production, fifty% prior to shipping and delivery
Packing internal box,several bins/grasp carton or as customer’s necessity
Shipping and delivery time  5-7days for Alanple time,5-25 times for creation